This structure contracted Shay Murtagh Precast by Carillion PLC, consisted of the renewal of an existing masonry arch bridge as part of the infrastructure upgrade on Southampton to Basingstoke line by Network Rail. The bridge had a clear span of 9.2m and had a clear width of 6.09m. The following items were manufactured and delivered to schedule.
2 edge conarchs, 20.7t
3 internal conarchs, 13t
4 cill beams, 14t
2 brick clad parapet edge beams, 32t
12 brick clad approach wall units, 7t
Small approach retaining wall units (50 linear metres) in 1m lengths varying in weight from 0.4t to 1.2t.